CASE 01Power
Reverse-engineered impellers for a thermal power utility
Thermal Power Utility, Western India
Reverse-engineered closed impellers replacing obsolete OEM at 1/3 the lead time.
Challenge
OEM impellers were obsolete; lead time on replacements had stretched to 22 weeks, putting plant availability at risk.
Solution
Reverse-engineered the hydraulic profile, validated against duty curve, manufactured in SS 17-4PH with G1.0 balancing.
Outcome
Delivered in 7 weeks. Field performance matched OEM within 1.5 % efficiency. Now standard supply.